Every sheet and spec, read on upload
Architectural, structural, civil, MEP, and the project manual — processed in minutes, answerable in plain English with sheet citations.
Measure storm pipe by run and count inlets, manholes and outlets from the drainage PDFs. Cross-check the plan, profile and structure schedule before your quantities go into the bid.
Start free · No card required · Works from the PDF plan set you already have
Record the upstream and downstream structure IDs. Measure LF by diameter and material, including separate culvert and underdrain items where specified.
Count each structure by type and size. Check grates, frames, junction boxes and structure depths against the schedule and details.
Count end sections and headwalls. Measure outlet protection by the unit called for, and check if excavation or stone is paid separately.
Use the profiles for invert and cover checks. Break out bedding and backfill by detail, and flag deep crossings or restoration before setting unit costs.
Start with the drainage plan and follow each line to its outlet. Compare the pipe callouts to the profile and check that the structure schedule accounts for every inlet and junction. Keep identifiers with the takeoff so someone else can find the run on the sheet.
Match the proposed grading around inlets and outfalls to the storm details. Flag places where the plan, the profile or the schedule disagree on slope, invert or outlet protection.
Carry the measurements into the budget by pipe class, structure type and pay unit. Use the specifications to check whether fittings, testing, bedding and temporary bypasses are separate items or included in the installed unit price.
Architectural, structural, civil, MEP, and the project manual — processed in minutes, answerable in plain English with sheet citations.
Quantities live on calibrated sheets as named objects you can see and correct — not black-box totals from a chat window.
Cross-discipline analysis surfaces the places the drawings disagree — the stuff that becomes RFIs and change orders.
Takeoff objects flow into the budget builder, priced from your cost catalog, company history, AI market estimates, or web pricing.
Measure pipe in LF and count each structure by type, then apply the bid form’s payment rules. Some fittings and accessories may be included in a larger item.
Use profiles and the structure schedule to check proposed cover and rim and invert elevations. Refer to the detail for bedding thickness and trench width.
Yes. Use the grading plan and its existing and proposed grades for basin earthwork. Take off the outlet pipe and structures from the drainage sheets.
Upload the plan set, ask it anything, measure what matters. Start free, no card required; the AI runs on credits.