Every sheet and spec, read on upload
Architectural, structural, civil, MEP, and the project manual — processed in minutes, answerable in plain English with sheet citations.
Start with the bid schedule and work back to the plan sheets. Measure each scope by station range, check the unit and carry the quantity into the correct pay item.
Start free · No card required · Works from the PDF plan set you already have
Check excavation and embankment by station and phase. Compare the cross-sections and quantity tables, and verify how the bid treats borrow and unsuitable material.
Measure areas and lengths where applicable. Check thickness and material notes in the typical sections, and use the specified basis for tonnage when the item pays by weight.
Measure pipe and culverts by size and class. Count inlets, outlets and end treatments against the schedule and crossing details.
Trace phase limits, then measure or count the temporary work against the plans. Confirm which items are paid separately and which are incidental.
Load the plans, bid schedule, special provisions and addenda. In Takeoff Studio, calibrate and measure each applicable sheet. Name the quantities by pay item, station range and phase to keep the marked sheets traceable.
Check the bid item’s payment language before rounding or converting units. Compare your takeoff with the agency quantity and record which sheet or revision explains a difference. Confirm how the letting documents handle discrepancies before changing a bid quantity.
For an interchange site, yard or other area with a grading PDF, use earthwork takeoff to check the surfaces and dirt balance. On a linear corridor, use the agency’s specified cross-sections and quantity method. Keep station breaks, material classes and pay limits with each line.
Architectural, structural, civil, MEP, and the project manual — processed in minutes, answerable in plain English with sheet citations.
Quantities live on calibrated sheets as named objects you can see and correct — not black-box totals from a chat window.
Cross-discipline analysis surfaces the places the drawings disagree — the stuff that becomes RFIs and change orders.
Takeoff objects flow into the budget builder, priced from your cost catalog, company history, AI market estimates, or web pricing.
Yes. Name and organize measured items by the bid schedule’s item numbers, units, station ranges and phases, then carry those quantities into your estimate.
Check the latest addenda, station limits, pay units and measurement rules. Record the sheet and revision behind the difference and follow the letting instructions for clarification.
A grading heat map can help check earthwork at a site with existing and proposed grades. For linear roadway quantities, review the DOT’s cross-sections and required pay item measurement method.
Upload the plan set, ask it anything, measure what matters. Start free, no card required; the AI runs on credits.