Propeller Alternative for PDF Earthwork Bids

Propeller uses survey data to measure the site you have. Foreman AI uses the grading PDF to take off the job you’re bidding. The right input depends on what you need to check.

Upload a Grading Plan

Foreman AI and Propeller side by side

Checked November 21, 2026 against the vendor’s public materials. This comparison is published by Foreman AI.

WorkflowForeman AIPropeller
Typical input The grading sheet with existing and proposed grades, plus the other bid PDFs. Drone or ground surveys for existing conditions, with design data for comparisons.
Typical output Planned cut and fill, quantities by pad and surface, topsoil, truck loads and a report on the bid plan. Survey-based volumes, design comparisons and takeoff reporting. Propeller lists exports for downstream estimating tools.
Where to use it Bid-stage takeoff and pricing from the plan set. Verify existing conditions before bidding or compare surveys to track earthwork as the job progresses.
Pricing $149 flat per grading plan Propeller invites buyers to request a demo and scopes platform pricing in a quote.

When a survey changes the bid

A grading sheet shows the existing conditions used for the design. A current survey can show where the site has changed since that sheet was drawn. If those changes could swing your haul costs or bid, a Propeller survey workflow can help you measure them.

When the bid set is the starting point

Start with Foreman when you’re quantifying the engineer’s plan at tender. Review the existing and proposed grades, split the dirt by area, then use the plan set to price paving, curb and utilities. If you have both plan and survey quantities, reconcile the limits, dates and elevation datum before you compare totals.

Frequently asked questions

Can Propeller be used before construction starts?

Yes. Propeller describes using drone or ground survey data to verify existing conditions and calculate earthwork quantities for a bid.

When should I compare quantities to a live survey?

Use a current survey when site conditions may have changed or when you need to measure progress. Match grading limits and the elevation datum before comparing volumes.

What if I only have a PDF grading plan?

Foreman can build estimating surfaces from available contours and spot elevations on the PDF. Check those surfaces against the plan and any survey or geotech information you have.

Get cut and fill from your grading PDF