Free Cut and Fill Calculator

Enter the cut and fill areas and their average depths. Check the dirt balance, the bank yards to import or export, and the loose yards and loads to haul.

Upload a Grading Plan

Calculate cut, fill and haul

Enter separate cut and fill areas. Use 0 for a side with no work.

Cut
Fill
Soil and trucks

Earthwork quantities

Cut before excavation
—
Fill required after compaction
—
Loose volume of all cut
—
Compacted fill from site cut
—
Net import or export, bank
—
Net import or export, loose
—
Truck loads for net haul
—

How the calculator works

  1. Cut and fill. Area in square feet × average depth in feet ÷ 27. Cut is in bank cubic yards (BCY) and required fill is in compacted cubic yards (CCY).
  2. Loose cut. Bank cut × (1 + swell % ÷ 100) gives loose cubic yards (LCY).
  3. Available compacted fill. Bank cut × (1 − shrink % ÷ 100).
  4. Material balance. Required compacted fill − available compacted fill. A positive result means import. A negative result means export. Divide the absolute difference by (1 − shrink % ÷ 100) for bank yards.
  5. Net haul loads. Multiply net bank yards by (1 + swell % ÷ 100), then divide the loose yards by truck capacity and round up.

The balance assumes all entered cut is reusable and uses the same shrink and swell for imported and on-site material. Check those assumptions and legal payload limits before pricing. Enter stripping or unsuitable material as a separate haul quantity in your estimate.

Frequently asked questions

What is the difference between bank, loose and compacted cubic yards?

Bank cubic yards (BCY) are measured before excavation. Loose cubic yards (LCY) are measured after excavation. Compacted cubic yards (CCY) are measured after the fill is placed and compacted.

How do I get the average depth?

Measure depths where you have existing and proposed grades. For a varying site, split it into smaller areas or grid cells, use a representative depth within each, and weight the average by area. Keep cut and fill separate.

What does 10% shrink mean in this calculator?

Each bank cubic yard yields 0.90 compacted cubic yards. Use assumptions from the geotech or supplier and confirm which volume basis they use.

What if some of the cut cannot be reused?

Estimate stripping, unsuitable soil and other nonreusable cut separately. Use only reusable material for this dirt balance, and add the separate haul and replacement quantities to your estimate.

Are the truck loads for all cut or just the import or export?

Truck loads shown here are for the net loose import or export. On-site moves and separately handled materials need their own haul count.

Have a PDF grading plan? Upload it and get the full heat map.