"Spot On to AGTEK and InSite": A PDF Earthwork Takeoff, Checked Head to Head

"It is spot on to Agtek and Insite which we have been using in the past."

That's from the chief estimator at a Bay Area demolition and excavation contractor. He has run AGTEK for 35 years and moved to InSite, and he tested Foreman AI the way any estimator should: he gave us a grading plan he had already taken off himself and compared the numbers line for line.

Short on time? Upload a grading plan PDF to Foreman AI's cut and fill software and get cut, fill, strip and net import or export back in under an hour, with a heat map and surfaces you can open in AGTEK or Trimble Business Center.

Why a PDF takeoff is the hard version

AGTEK, InSite and Trimble Business Center are at their best when you have the engineer's CAD files, where the surfaces already exist as 3D data. Most bids don't come with CAD. They come as a PDF set.

From a PDF, someone has to rebuild the surfaces by hand: set the scale on each sheet, line the sheets up, trace the existing contours, and type in the proposed spot grades and pad elevations one at a time. That's why the estimator above told us InSite "works fine but requires a full time take off person."

That's the version Foreman AI does automatically.

What Foreman AI did on this job, from the PDF

The test job was a multifamily site of about 2.2 acres: a pad grading plan and four grading and drainage sheets, all PDF.

  • Scale and registration: found the scale on each sheet, checked it against printed dimensions (all within about 0.35%), and lined the four sheets up into one site.
  • Existing ground: traced 117 contour lines and read the existing spot shots off the drawings.
  • Proposed grade: read 312 printed elevation callouts, including the small ones, and placed them at their leader points. It traced 5 building pads with their finished floor and pad elevations.
  • Sections: applied the slab, plaza, paver and sidewalk sections and the topsoil strip, each listed so the estimator can change them.
  • Quantities: raw cut and fill, topsoil strip, cut and fill to subgrade, shrink and swell, net export, and truckloads.

The first full package was back in about 20 minutes. Nobody digitized anything.

How it was checked before it went out

An estimator shouldn't have to take a number on faith, so the takeoff carries its own checks:

  • Two independent volume runs: a 2.5-ft grid and a TIN built from the same surfaces agreed within about 0.2% on net export.
  • Held-out grades: ten printed spot grades were kept out of the surface, then compared to it. They matched within 0.16 ft.
  • Coverage: every point inside the grading limit had both an existing and a proposed elevation, with no holes or flat-zero areas.
  • The swing called out up front: the survey showed stockpile mounds on site. The report gave net export both ways, with the stockpiles in place and with them already hauled off, because that's the first place two takeoffs disagree.

What came with it

  • A cut and fill heat map with the pads labeled, plus a 25-ft cut/fill grid in crew format (C2.04 / F0.09) and a grade sheet for staking
  • Existing and proposed surfaces as LandXML and DXF, which open in AGTEK and Trimble Business Center
  • A 3D viewer you can spin and morph from existing ground to finished grade
  • The risks priced before you bid: a 1-ft building undercut, soils that can't be reused, the bioretention section
  • Priced earthwork lines at starting prices, ready for your own rates

The takeaway

The estimator checked our PDF takeoff against two desktop tools he has trusted for decades, and it matched. The difference is the work it took to get there: no CAD file, no digitizing, no full-time takeoff person.

If you bid site work from PDF plan sets, send us a set you're bidding and check it against your own numbers.

FAQ

Can a PDF earthwork takeoff really match AGTEK?

On this job it did. A chief estimator with 35 years on AGTEK compared it to his own AGTEK and InSite takeoffs and called it spot on. Accuracy still depends on the plan set: clear contours, readable spot grades and a complete grading plan matter for any method.

Do I need CAD files?

No. Foreman AI reads the contours and spot grades off the PDF. If you do have CAD, the surfaces we deliver as LandXML and DXF line up with your own models in AGTEK or Trimble Business Center.

How long does it take?

The first full package on this job was back in about 20 minutes. Most grading plans come back in under an hour.

Can I check it in my own software?

Yes. The existing and proposed surfaces come as LandXML and DXF, so you can compare surface to surface in AGTEK, InSite or Trimble Business Center, not just the totals.

Ready to transform your pre-construction workflow?

See how Foreman AI can analyze your construction plans in seconds, not hours.

Try Foreman AI Free
Share this article: Twitter LinkedIn